Jumeirah Hotel Group

Location

Jumeirah Beach Hotel, Dubai UAE

SCOPE

AED250,000 to AED500,000

PROJECT

Upgrade For Increased Member Engagement

The aim of this project was to upgrade the performance “HUB” and Main Gym Floor to increase member engagement, provide a custom waterjet cut entrance area, the spa entrance, the Fit In Time area and the reception areas. The old rubber flooring was removed and replaced with a combination of custom-designed green and white Attack Turf and 18mm Achieve Rubber.

High Performance Flooring

A full PLAE Solution was installed throughout Talise using a PLAETech Underlay in areas of high impact. Given the client’s previous issues with their flooring, it was imperative to provide performance flooring products that would withstand heavy use, offer a real difference to the end users and have a warranty to back it up.

Based on numerous samples, PLAE was the only brand Talise found to achieve these 3 criteria.

No items found.

ARE YOU A GYM OR PT?

Ask about our wholesale prices for commercial businesses in the Middle East.

Please wait for confirmation.
Oops! Something went wrong. Please try again.