The aim of this project was to upgrade the performance “HUB” and Main Gym Floor to increase member engagement, provide a custom waterjet cut entrance area, the spa entrance, the Fit In Time area and the reception areas. The old rubber flooring was removed and replaced with a combination of custom-designed green and white Attack Turf and 18mm Achieve Rubber.
A full PLAE Solution was installed throughout Talise using a PLAETech Underlay in areas of high impact. Given the client’s previous issues with their flooring, it was imperative to provide performance flooring products that would withstand heavy use, offer a real difference to the end users and have a warranty to back it up.
Based on numerous samples, PLAE was the only brand Talise found to achieve these 3 criteria.
Ask about our wholesale prices for commercial businesses in the Middle East.